JIMMY DELOACH PKWY over US80

BLOOMINGDALE CITY LIMITS · County 051, Georgia · Built 2021 · 2 Lanes · 18,020 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005151210
Year Built
2021
Length
79.9 m (262.1 ft)
Max Span
42.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
18,020
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,284,000
Total Project Cost
$18,426,000