JIMMY DELOACH PKY over GEORGIA CENTRAL RAILROAD
1.9 MI N OF INT. SR 404 · County 051, Georgia · Built 2020 · 2 Lanes · 20,682 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.124539, -81.312753
This bridge is in worse condition than 12.7% of bridges in County 051. The average bridge in Georgia is 0 years old; this one is 6 years old.
Nearby Bridges
JIMMY DELOACH PKY over GEORGIA CENTRAL RAILROAD
Built 2020
JIMMY DELOACH PKWY over SR 26 US 80
Built 2021
JIMMY DELOACH PKWY over US80
Built 2021
ADAMS ROAD over PIPEMAKER CANAL
Built 1980
OSTEEN ROAD over LITTLE OGEECHEE RIVER
Built 1977
SR17 over LITTLE OGEECHEE RIVER
Built 2022
SR17 over LITTLE OGEECHEE RIVER
Built 2021
SR 17 over LITTLE OGEECHEE RIV TRIB
Built 1965
SR 17 over I-16 (SR 404)
Built 1966
I-16 (WBL) over LITTLE OGEECHEE RIVER
Built 1966
Bridge Details
- Structure #
- 000000005151190
- Year Built
- 2020
- Length
- 72.8 m (238.8 ft)
- Max Span
- 36.6 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 20,682
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,238,000
- Total Project Cost
- $31,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.