JIMMY DELOACH PKY over GEORGIA CENTRAL RAILROAD

1.9 MI N OF INT. SR 404 · County 051, Georgia · Built 2020 · 2 Lanes · 18,020 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005151180
Year Built
2020
Length
72.8 m (238.8 ft)
Max Span
36.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
18,020
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,238,000
Total Project Cost
$31,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.