SR 204 over KING GEORGE BLVD

4 MI E OF I-95/SR204 · County 051, Georgia · Built 2018 · 3 Lanes · 63,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005151040
Year Built
2018
Length
48.5 m (159.1 ft)
Max Span
48.5 m
Width
24.7 m (81 ft)
Lanes
3
Daily Traffic
63,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,119,000
Total Project Cost
$21,178,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.