SR 204 over TIDAL CANAL

8 MI SW OF SAVANNAH · County 051, Georgia · Built 1971 · 4 Lanes · 59,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005100730
Year Built
1971
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
27.7 m (90.9 ft)
Lanes
4
Daily Traffic
59,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$543,000
Total Project Cost
$815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.