SW BYPASS SBL over FOREST RIVER TRIB

1.60 MI E OF I-95 · County 051, Georgia · Built 2001 · 3 Lanes · 5,390 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005150590
Year Built
2001
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
11.4 m (37.4 ft)
Lanes
3
Daily Traffic
5,390
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,989,000
Total Project Cost
$2,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.