AIRPORT ROAD over I-95 (SR 405)
2 MI N OF POOLER · County 051, Georgia · Built 1994 · 6 Lanes · 36,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.155611, -81.233569
This bridge is in worse condition than 18.3% of bridges in County 051. The average bridge in Georgia is 0 years old; this one is 32 years old.
Nearby Bridges
I-95 (SBL) over WALTHOUR SWAMP
Built 1976
I-95 (NBL) over WALTHOUR SWAMP
Built 1976
J DELOACH PKWY EB over I-95 SR 405
Built 1999
J DELOACH PKWY WB over I-95 SR 405
Built 1999
JIMMY DELOACH PKY over WALTHOUR SWAMP
Built 1996
I-95 (NBL) over PIPE MAKERS CANAL
Built 1976
I-95 (SBL) over PIPE MAKERS CANAL
Built 1976
I-95 (SBL) over AUGUSTINE CREEK
Built 1976
I-95 (NBL) over AUGUSTINE CREEK
Built 1976
JIMMY DELOACH PKY over CSX RAILROAD
Built 1996
Bridge Details
- Structure #
- 000000005101760
- Year Built
- 1994
- Length
- 79.9 m (262.1 ft)
- Max Span
- 26.8 m
- Width
- 35.1 m (115.2 ft)
- Lanes
- 6
- Daily Traffic
- 36,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,420,000
- Total Project Cost
- $3,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.