JIMMY DELOACH PKY over CSX RAILROAD

6.8 MI NE OF POOLER · County 051, Georgia · Built 1996 · 4 Lanes · 14,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005150520
Year Built
1996
Length
51.2 m (168 ft)
Max Span
26.5 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
14,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,014,000
Total Project Cost
$1,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.