I-95 (NBL) over WALTHOUR SWAMP

3.1 MI N OF POOLER · County 051, Georgia · Built 1976 · 3 Lanes · 86,400 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000005101170
Year Built
1976
Reconstructed
1996
Length
10.7 m (35.1 ft)
Max Span
2.4 m
Lanes
3
Daily Traffic
86,400
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$174,000
Total Project Cost
$261,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.