LAMPODOSHIA ROAD over SPARKMAN CREEK
9 MI NE OF WOODBINE · County 039, Georgia · Built 2002 · 2 Lanes · 158 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.032658, -81.586922
This bridge is in worse condition than 27.4% of bridges in County 039. The average bridge in Georgia is 0 years old; this one is 24 years old.
Nearby Bridges
LAMPODOSHIA ROAD over DOVER CREEK TRI
Built 2008
HORSE STAMP CH RD over HARDY SWAMP
Built 2003
HORSE STAMP ROAD over I-95 (SR405)
Built 2011
I-95 (NBL) over WHITE OAK CREEK
Built 1975
I-95 (SBL) over WHITE OAK CREEK
Built 1975
I-95 (NBL) over CANOE SWAMP
Built 1975
I-95 (SBL) over CANOE SWAMP
Built 1975
CR 138 over SWEENEY CREEK
Built 1965
DOVER BLUFF ROAD over I-95 (SR 405)
Built 1975
DOVER BLUFF ROAD over BAKERS SWAMP
Built 1978
Bridge Details
- Structure #
- 000000003950570
- Year Built
- 2002
- Length
- 12.2 m (40 ft)
- Max Span
- 6.1 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 158
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.