I-95 (NBL) over WHITE OAK CREEK

6.75 MI NE OF WOODBINE · County 039, Georgia · Built 1975 · 3 Lanes · 62,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000003900420
Year Built
1975
Reconstructed
2001
Length
285 m (935 ft)
Max Span
25.9 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
62,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,650,000
Total Project Cost
$6,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.