I-475 SBL over TOBESOFKEE CREEK O/F

2 MI S OF MACON CTY LIMIT · County 021, Georgia · Built 1965 · 3 Lanes · 43,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101400
Year Built
1965
Reconstructed
2000
Length
78 m (255.9 ft)
Max Span
9.8 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
43,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,273,000
Total Project Cost
$1,910,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.