I-16 EBL over SR 87 (US 23)
3 MI E OF MACON @ EXIT 6 · County 021, Georgia · Built 1967 · 2 Lanes · 38,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.799736, -83.569492
This bridge is in worse condition than 82.3% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 59 years old.
Nearby Bridges
US 23-US 129 ALT over SWIFT CREEK
Built 1930
I-16 WBL over SR 87 (US 23)
Built 1967
JOE TAMPLIN IND BD over SWIFT CREEK
Built 1971
US 23-129 ALT NBL over CSX RAILROAD
Built 1970
US 23-129 ALT SBL over CSX RAILROAD
Built 1970
US 23-US 129 ALT over STONE CREEK
Built 1930
I-16 over STONE CREEK
Built 1967
I-16 EBL over OCMULGEE RIVER OVERFLOW
Built 1967
I-16 WBL over OCMULGEE RIVER OVERFLOW
Built 1967
I-16 WBL over OCMULGEE RIVER OVERFLOW
Built 1967
Bridge Details
- Structure #
- 000000002101310
- Year Built
- 1967
- Length
- 68.6 m (225.1 ft)
- Max Span
- 20.1 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 38,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $879,000
- Total Project Cost
- $1,319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.