US 23-US 129 ALT over SWIFT CREEK

5 MI E OF MACON · County 021, Georgia · Built 1930 · 4 Lanes · 7,960 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000002100450
Year Built
1930
Reconstructed
1970
Length
6.7 m (22 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
7,960
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$133,000
Total Project Cost
$199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.