US 23-129 ALT SBL over CSX RAILROAD

4.7 MI E OF MACON · County 021, Georgia · Built 1970 · 3 Lanes · 7,960 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000002100470
Year Built
1970
Length
57.6 m (189 ft)
Max Span
19.2 m
Width
24.3 m (79.7 ft)
Lanes
3
Daily Traffic
7,960
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$940,000
Total Project Cost
$1,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.