I-75 SBL over M-3213 WESLEYAN DRIVE

3 MI NW OF MACON · County 021, Georgia · Built 1965 · 2 Lanes · 41,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101120
Year Built
1965
Length
46 m (150.9 ft)
Max Span
16.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
41,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$590,000
Total Project Cost
$885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.