BASS ROAD over I-75 (EXIT 172)@172.26N

4 MI NW OF MACON · County 021, Georgia · Built 1965 · 2 Lanes · 13,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100700
Year Built
1965
Length
65.8 m (215.9 ft)
Max Span
22.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
13,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.