I-75 SBL over SR 87 (US 23 EXIT 171)

2 MI N OF MACON · County 021, Georgia · Built 1965 · 2 Lanes · 41,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101100
Year Built
1965
Length
75.9 m (249 ft)
Max Span
20.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
41,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$973,000
Total Project Cost
$1,459,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.