SR 74 over I-475 (SR 408 EXIT 5)

1 MI W OF MACON · County 021, Georgia · Built 1965 · 5 Lanes · 21,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100400
Year Built
1965
Reconstructed
1983
Length
98.5 m (323.2 ft)
Max Span
28.7 m
Width
24.5 m (80.4 ft)
Lanes
5
Daily Traffic
21,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,295,000
Total Project Cost
$3,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.