I-475 over SR 22 (US 80)

W EDGE OF MACON CTY LMT · County 021, Georgia · Built 1965 · 6 Lanes · 64,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101410
Year Built
1965
Reconstructed
2000
Length
77.7 m (254.9 ft)
Max Span
22.9 m
Width
42.4 m (139.1 ft)
Lanes
6
Daily Traffic
64,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,083,000
Total Project Cost
$3,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.