I-475 over ROCKY CREEK

2 MI W OF MACON CTY LIMIT · County 021, Georgia · Built 1965 · 6 Lanes · 57,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101430
Year Built
1965
Reconstructed
2001
Length
67.4 m (221.1 ft)
Max Span
27.1 m
Width
39.5 m (129.6 ft)
Lanes
6
Daily Traffic
57,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,805,000
Total Project Cost
$2,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.