COUNTY FARM ROAD over BISHOP CREEK

7.2 MI W OF BAXLEY · County 001, Georgia · Built 1976 · 2 Lanes · 480 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000150070
Year Built
1976
Reconstructed
2003
Length
61 m (200.1 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
480
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.