COUNTY FARM ROAD over BLACK WATER CREEK

2 MI SW OF BAXLEY · County 001, Georgia · Built 1963 · 2 Lanes · 1,430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000150060
Year Built
1963
Length
36.6 m (120.1 ft)
Max Span
9.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,430
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.