COUNTY FARM ROAD over BIG SATILLA CREEK

1 MI E OF JEFF DAVIS LINE · County 001, Georgia · Built 1980 · 2 Lanes · 280 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000150040
Year Built
1980
Reconstructed
2003
Length
67.1 m (220.1 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
280
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$860,000
Total Project Cost
$1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.