FAU Blvd. over I95 SR9
I95 SB Off Ramp · County 099, Florida · Built 2017 · 2 Lanes · 15,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
26.390756, -80.098825
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 9 years old.
Nearby Bridges
I 95 SR 9 over El Rio Canal
Built 1974
Spanish River Blvd over LWDD E-4/El Rio Canal
Built 2017
FAU Blvd. over LWDD E-4 El rio Canal
Built 2017
Spanish River Blvd over LWDD E-4/El Rio Canal
Built 2017
I-95 NB On Ramp over Ramp A
Built 2017
SR 794 (Yamato Rd) over El Rio Canal (E-4)
Built 1967
I 95 SB Off Ramp over SR 794 Yamato Rd.
Built 2017
Spanish River Blvd over El Rio Canal
Built 2002
I 95 SB over SR 794 Yamato Rd
Built 1973
I 95 NB over SR 794 Yamato Rd
Built 1973
Bridge Details
- Structure #
- 930554
- Year Built
- 2017
- Length
- 101.1 m (331.7 ft)
- Max Span
- 53.2 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 15,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.