Spanish River Blvd over LWDD E-4/El Rio Canal

Spanish River to NB I95 · County 099, Florida · Built 2017 · 1 Lanes · 1,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
930548
Year Built
2017
Length
57 m (187 ft)
Max Span
57 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.