Spanish River Blvd over LWDD E-4/El Rio Canal

Spanish River to NB I95 · County 099, Florida · Built 2017 · 2 Lanes · 6,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
930549
Year Built
2017
Length
56.3 m (184.7 ft)
Max Span
56.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.