SR 924 WB over I-75 Ramp to NB SR 826

800 ft. East of SR 826 · County 086, Florida · Built 1986 · 4 Lanes · 34,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
870650
Year Built
1986
Length
47.5 m (155.8 ft)
Max Span
24.7 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
34,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.