I-75 SB over SR-826

I-75/SR-826 INTERCHANGE · County 086, Florida · Built 1986 · 4 Lanes · 72,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870646
Year Built
1986
Length
121.6 m (399 ft)
Max Span
53 m
Width
20.5 m (67.3 ft)
Lanes
4
Daily Traffic
72,250
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.