SR826 SB TO I-75SB over I-75 W-N CONN & NW138 ST

I-75/SR-826 INTERCHANGE · County 086, Florida · Built 1986 · 1 Lanes · 2,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870645
Year Built
1986
Length
84.1 m (275.9 ft)
Max Span
42.1 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
2,100
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.