I-95 NB TO SR91 over US-441

GOLDEN GLADES INTERCHANGE · County 086, Florida · Built 1967 · 3 Lanes · 46,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
870245
Year Built
1967
Length
72.2 m (236.9 ft)
Max Span
23.5 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
46,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.