SR-826 TO I-95SB over I-95 AND SR7 RAMP NB

SR826 TO I-95 GOLDEN GLAD · County 086, Florida · Built 1963 · 1 Lanes · 7,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
870042
Year Built
1963
Length
97.5 m (319.9 ft)
Max Span
28.3 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
7,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.