SR-826 over SR 826 OVER I95 SB RAMP

SR7 & SR826 SB RAMP · County 086, Florida · Built 1963 · 4 Lanes · 60,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870046
Year Built
1963
Length
52.1 m (170.9 ft)
Max Span
22.6 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
60,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.