SR869 SB TO I595EB over NW 8TH ST (Proposed)
1.1MI SOUTH OF SR-838 · County 011, Florida · Built 1988 · 2 Lanes · 12,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
26.131331, -80.343889
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 38 years old.
Nearby Bridges
SB SR869 to SB I75 over NW 8th St. (proposed)
Built 1988
NB I75 to NB SR869 over NW 8th St. (proposed)
Built 1988
SR-869SB to I-75NB over SR-84 WB & NEW RIVER
Built 1989
SB 869 to SB I-75 over WB SR-84 & N. New River
Built 1988
NB I-75 to NB 869 over SR-84 WB and New River
Built 1988
WB 595 TO NB SR869 over WB SR84 & New River Cnl
Built 1988
I-595 WB to SR-84 over Retention Pond
Built 2008
SB-869 To EB I-595 over I-75 Cnctrs & New River
Built 1989
NB I-75 From SR869 over I-595 WB Ramp
Built 2008
Ramp R2 over I-595/SR-862
Built 2016
Bridge Details
- Structure #
- 860520
- Year Built
- 1988
- Length
- 56.9 m (186.7 ft)
- Max Span
- 31.7 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 12,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.