SB 869 to SB I-75 over WB SR-84 & N. New River

I-595 / I-75 Interchange · County 011, Florida · Built 1988 · 3 Lanes · 27,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
860517
Year Built
1988
Length
118.3 m (388.1 ft)
Max Span
42.7 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
27,500
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.