NB I-75 From SR869 over I-595 WB Ramp
NB I75 Ramp From SR869 SB · County 011, Florida · Built 2008 · 1 Lanes · 7,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.121861, -80.348528
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 18 years old.
Nearby Bridges
I-595 WB to SR-84 over Retention Pond
Built 2008
I-75 SB TO 869 NB over I-75 CONNCTRS &NEW RIVER
Built 1989
I595 WB to I75 SB over I-75 & I-75 Connectors
Built 1986
SR-869SB to I-75NB over SR-84 WB & NEW RIVER
Built 1989
SR-84 EB over I-75 (SR-93)
Built 1986
SB 869 to SB I-75 over WB SR-84 & N. New River
Built 1988
SB-869 To EB I-595 over I-75 Cnctrs & New River
Built 1989
SB SR869 to SB I75 over I75 connectors&EB SR-84
Built 1988
I-75 SB to EB I595 over I-75 (SR-93)
Built 1986
I-75 to I-595 RvLn over I75 SR84 & SR869
Built 2014
Bridge Details
- Structure #
- 860641
- Year Built
- 2008
- Length
- 19.4 m (63.6 ft)
- Max Span
- 19.4 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 1
- Daily Traffic
- 7,300
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.