CR-419 NB over Econlockhatchee River

2.5 Mi SE of CR-426 · County 117, Florida · Built 2003 · 2 Lanes · 21,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
774044
Year Built
2003
Length
181.7 m (596.1 ft)
Max Span
22.6 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
21,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.