CR-419 SB over Econlockhatchee River

2.5 mi SE of CR-426 · County 117, Florida · Built 1993 · 2 Lanes · 21,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
774033
Year Built
1993
Length
182.3 m (598.1 ft)
Max Span
22.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
21,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.