I-4 EB Ramp M1 over CR 46A EB
I-4 EB Ramp M1-CR 46A EB · County 117, Florida · Built 2023 · 1 Lanes · 1,000 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
28.798239, -81.344353
This bridge is in worse condition than 16.3% of bridges in County 117. The average bridge in Florida is 0 years old; this one is 3 years old.
Nearby Bridges
I-4 WB Ramp N2 over I-4
Built 2023
I-4 EBCD Ramp M3 over Ramp N1
Built 2022
Ramp M3 over SR 429
Built 2021
CR 46A EB over SR 429
Built 2023
I-4 EB over SR 429
Built 2021
Ramp L2 over SR 429
Built 2023
I-4 WB over SR 429
Built 2023
I-4 EB Ramp M1 over SR 429
Built 2016
Ramp N2 over SR 429
Built 2023
I-4 WBCD Ramp O1 over SR 429
Built 2021
Bridge Details
- Structure #
- 770133
- Year Built
- 2023
- Length
- 57.6 m (189 ft)
- Max Span
- 57 m
- Width
- 12.2 m (40 ft)
- Lanes
- 1
- Daily Traffic
- 1,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.