I-4 WBCD Ramp O1 over SR 429
I-4 WBCD Ramp O1-SR 429 · County 117, Florida · Built 2021 · 4 Lanes · 4,700 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
28.796111, -81.346389
This bridge is in worse condition than 16.3% of bridges in County 117. The average bridge in Florida is 0 years old; this one is 5 years old.
Nearby Bridges
I-4 EB Ramp M1 over SR 429
Built 2016
I-4 WB over SR 429
Built 2023
Ramp N2 over SR 429
Built 2023
I-4 EB over SR 429
Built 2021
Ramp L2 over SR 429
Built 2023
CR 46A EB over SR 429
Built 2023
Ramp M3 over SR 429
Built 2021
SR 429 NB Ramp L2 over I-4
Built 2023
I-4 WB Ramp N2 over I-4
Built 2023
I-4 EB Ramp M1 over CR 46A EB
Built 2023
Bridge Details
- Structure #
- 770123
- Year Built
- 2021
- Length
- 89.3 m (293 ft)
- Max Span
- 34.1 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 4,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.