I-4 WB Off Ramp over I-4 CD
I4 WB Off Ramp Over I4 CD · County 095, Florida · Built 2001 · 2 Lanes · 16,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
28.352708, -81.527947
This bridge is in worse condition than 26.5% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 25 years old.
Nearby Bridges
I-4 EB Off Ramp over I-4 EB On Ramp
Built 2001
Chelonia Pkwy over Bonnet Canal
Built 2003
SR-536 Ramp B over I-4
Built 1982
Ramp C2 over Oceola Parkway Ramp C3
Built 2001
Ramp D2 over Bonnet Creek
Built 2001
Ramp C4- Retention over Retention Pond
Built 2001
Ramp CD over Bonnet Creek
Built 2000
Osceola Pwky EB over I-4
Built 1995
I-4 EB over Bonnet Creek
Built 1960
I-4 EB Ramp over Bonnet Creek
Built 2001
Bridge Details
- Structure #
- 750556
- Year Built
- 2001
- Length
- 67.6 m (221.8 ft)
- Max Span
- 33.5 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 16,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.