Chelonia Pkwy over Bonnet Canal

0.8 Mi S of Buena Vista D · County 095, Florida · Built 2003 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
756500
Year Built
2003
Length
45.7 m (149.9 ft)
Max Span
14.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.