Ramp D2 over Bonnet Creek
Ramp D2 - Bonnet Creek · County 097, Florida · Built 2001 · 2 Lanes · 8,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
28.346214, -81.533908
This bridge is in worse condition than 35.2% of bridges in County 097. The average bridge in Florida is 0 years old; this one is 25 years old.
Nearby Bridges
Ramp C4- Retention over Retention Pond
Built 2001
Ramp CD over Bonnet Creek
Built 2000
I-4 WB over Bonnet Creek
Built 1960
Osceola Parkway WB over I-4
Built 2001
Osceola Pwky EB over I-4
Built 1995
I-4 EB over Bonnet Creek
Built 1960
I-4 EB Ramp over Bonnet Creek
Built 2001
Osceola Parkway EB over Ramp A2
Built 2001
Ramp C2 over Oceola Parkway Ramp C3
Built 2001
Ramp D2 over Ramp D1
Built 2006
Bridge Details
- Structure #
- 920183
- Year Built
- 2001
- Length
- 80.2 m (263.1 ft)
- Max Span
- 26.5 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 8,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.