RAMP J over I-95 NB CD

RAMP J to I-95 NB CD · County 031, Florida · Built 2017 · 1 Lanes · 9,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
720790
Year Built
2017
Length
296.5 m (972.8 ft)
Max Span
84.7 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
9,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.