I-95 NB/COLLECTOR over HENDRICKS/KING/MONTANA

I-95 NB/HEND/KINGS/MONT. · County 031, Florida · Built 2017 · 5 Lanes · 85,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
720781
Year Built
2017
Length
421.8 m (1383.9 ft)
Max Span
43.4 m
Width
37 m (121.4 ft)
Lanes
5
Daily Traffic
85,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.