I-95 SB over RAMPS N & P

I-95 SB OVER RAMPS N&P · County 031, Florida · Built 2016 · 5 Lanes · 71,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
720786
Year Built
2016
Length
47.1 m (154.5 ft)
Max Span
47.1 m
Width
27.2 m (89.2 ft)
Lanes
5
Daily Traffic
71,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.