CR273 Orange Hill over Hard Labor Creek

1.46 Mi. S of CR 278 · County 133, Florida · Built 2023 · 2 Lanes · 3,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
614172
Year Built
2023
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
3,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.