CR278 (Pioneer Rd) over Hard Labor Creek
2.3 Mi. W. of SR 77 · County 133, Florida · Built 1958 · 2 Lanes · 900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
30.633303, -85.552439
This bridge is in worse condition than 94.9% of bridges in County 133. The average bridge in Florida is 0 years old; this one is 68 years old.
Nearby Bridges
CR 278 over Unnamed Branch
Built 1951
CR 278 over Reedy Creek
Built 1958
CR 278 over Reedy Creek
Built 1958
SR77 over Stream
Built 1957
CR 278 over Unnamed Branch
Built 1940
SR77 over Hard Labor Creek
Built 2020
SR77 over Hard Labor Creek
Built 1992
CR273 Orange Hill over Hard Labor Creek
Built 2023
CR 278 over Unnamed Branch
Built 1951
CR 273 over Hard Labor Creek
Built 1951
Bridge Details
- Structure #
- 610044
- Year Built
- 1958
- Length
- 61.1 m (200.5 ft)
- Max Span
- 6.2 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.