SR77 over Hard Labor Creek
2.0 Miles N. of Wausau · County 133, Florida · Built 2020 · 2 Lanes · 8,900 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.662592, -85.577475
This bridge is in worse condition than 32.3% of bridges in County 133. The average bridge in Florida is 0 years old; this one is 6 years old.
Nearby Bridges
SR77 over Hard Labor Creek
Built 1992
SR77 over Stream
Built 1957
Duncan Cmty Road over Flat Creek
Built 2013
Hard Labor Road over Hard Labor Creek
Built 1990
CR 278 over Reedy Creek
Built 1958
CR 278 over Reedy Creek
Built 1958
CR 278 over Unnamed Branch
Built 1940
SR77 over Flat Creek
Built 1999
SR77 over Flat Creek
Built 2017
CR278 (Pioneer Rd) over Hard Labor Creek
Built 1958
Bridge Details
- Structure #
- 610165
- Year Built
- 2020
- Length
- 119.5 m (392.1 ft)
- Max Span
- 17.1 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 8,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.