CR 270 over Crooked Creek

2.29 Miles West of CR 269 · County 039, Florida · Built 1996 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
504136
Year Built
1996
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
450
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.